MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.
Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.

"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added., This news data comes from:http://ey-xae-cd-flj.yamato-syokunin.com
- Putin meets Kim, praises North Korean troops in Russia
- Trump moves to cut more foreign aid, risking shutdown
- Australia to tackle deepfake nudes, online stalking
- Motive probed for US shooting that killed two children, injured 17
- Leviste files charges against DPWH engineer who tried to bribe him
- Marcos mum on Magalong joining independent commission for DPWH probe
- National Guard troops begin carrying weapons in US capital
- Malacañang calls plot to jail VP Duterte 'wild imagination'
- Trump escalates crackdown threats with Chicago 'war' warning
- Drones take on Everest's garbage